Air conditioning for a small office in Kent

Synecore was approached by PTA UK Ltd to provide an air conditioning system for their head office, based in Shipbourne Road, Tonbridge, Kent.

With an expanding workforce the small office required an air conditioning unit that is efficient, while providing heating and cooling solutions. The Toshiba RAS Inverter High Wall (AvAnt) posed the most suitable air conditioning unit for the space, it provided the correct kW rating and its slim-line flat panel design sits discretely upon the wall.

The low sound level of this unit means it is unobtrusive within a small office environment, and the easy-to-use remote control, with a large digital display, enables anyone within the office to adjust the temperature for optimum comfort.

Once installed, Synecore’s engineers carried out an inspection and service of the existing air conditioning equipment to ensure the Kent-based office was Fgas compliant and the equipment remained efficient.

Diane Wegg, the Office Manager for PTA UK said, “PTA UK approached Synecore as one of three possible companies to install a wall mounted inverter air conditioning unit. We found them to be extremely professional throughout the whole process, from the initial visit to assess our requirements, through to the installation and after service.

“The Synecore team worked with us to ensure that we were entirely happy with the installation process before the work commenced, and whilst they were onsite they ensured that the installation was completed with minimum disruption to our team and business.”

For helpful advice on choosing the right air conditioning system for your office – large or small – or to book a service for your existing air conditioning system, call 0845 241 4953.

Client

PTA Tonbridge, Kent

Equipment

Toshiba RAS Inverter High Wall (AvAnt) air conditioning unit

Diane Wegg, the Office Manager for PTA UK said,

“PTA UK approached Synecore as one of three possible companies to install a wall mounted inverter air conditioning unit. We found them to be extremely professional throughout the whole process, from the initial visit to assess our requirements, through to the installation and after service.
 
“The Synecore team worked with us to ensure that we were entirely happy with the installation process before the work commenced, and whilst they were onsite they ensured that the installation was completed with minimum disruption to our team and business.”