CIBOSANO

PROJECT OUTLINE:

Synecore were delighted to handover a new Distribution coldroom to their very happy client recently.

17m x 6m x 6m manufactured in Kingspan PIR Fire Rated Coldroom Panels, every inch of space was utilised to ensure maximum capacity was taken.

Remote Weatherproof Plant manufactured by JE Hall and the Market leading Searle “GEA” range ensured maximum efficiency on the evaporators.

Synecore worked closely with us from the very beginning, the actual final design is very different to what we had in mind, Paul and his team brought their expertise to us and delivered a much better, more efficient use of the space we had.

Client

Cibosano

Budget

£40,000

Brian Trundle, Contracts Director, Ecsec Ltd,

“They project manage every installation with their own guys and attend all site meetings to ensure we are aware of progress. In fact I would go as far to say that Synecore are the most professional electrical contractors that I have ever worked with. We have no doubt that our relationship with Synecore will go from strength to strength”